Home>Projects>Projects Major Projects

Major Projects Summary

 

Calais Port Project

Location: France
Client: Bouygues
Work Scope: Procurement and fabrication of pile pipes with coating system reinforcement system
Quantity: 1,800 MT
Standard: EN10025-S460M/N, EN1090 EXC 3
Size: OD: 1,800/2,500mm; WT: 22-36; Length: 44,000mm

LNG Canada Berth 2 Project

Location: Canada
Client: JGC-Fluor
End Use: Joint Venture-Shell, PETRONAS, PetroChina, Mitsubishi Corporation and KOGAS
Work Scope: Fabrication Management & Project Management for Pile pipe with C9 and coating
Standard: API 5L X65 PSL1
Quantity: 20,000 MT
Size: OD: 1422-1778mm; WT: 20/25; Length: 35,000-48,300mm

Dominican Steel Jackets System Project

Location: Dominican
Client: Intercoastal Marine, INC
Work Scope: Fabrication Management of Structural Steel, Structural Pile, Fender, Site Service, etc., with structural steel delivery in modular conditions.
Quantity: More than 3,000 MT

New Sheltered Phosphate Port Project

Location: Morocco
Client: ARCHIRODON GROUP N.V.W’
End Use: OCP SA GROUP
Work Scope: Fabrication Management & Project Management for Steel Box Girders
Quantity: Around 25,000 MT

Tortue Development Project

Location: Senegal
EPC: Saipem
End Use: BP
Work Scope: Fabrication Management & Project Management for Pile Pipe, Sleeve, Cone, Jacket Can with Sear Keys, J-tubes
Quantity: Around 20,000 MT

Quellaveco Open Pit Copper Mine Project

Location: Peru
End User: AngloAmerican
EPCM: Fluor
Work Scope: Connection engineering, detailing engineering, steel structures fabrication and supply, miscellaneous products supply and local services
Standard: AISC 360-10, AISC 341-10, AWS D1.1-15, AWS D1.8-16
Quantity: Around 13,000 MT

PONTOON Structure and Outfittingl

Location: Chile
Client: ASCON
Work Scope: Fabrication Management & Project Management for pontoon structure and outfitting
Quantity: 5 pontoons
Size: Length: 41.439m; Beam: 13m; Height: 3.4m

Peljesac Bridge Project

End Use: China Road & Bridge Corporation
Client: ArcelorMittal Projects
Location: Croatia
Work Scope: Fabrication Management, logistic services for Steel Pile, with discharge proposal for site erection
Quantity: More than 15,000 MT
Single Pile Size: Length: 128m with 250 MT

Cobre Panama Project

Location: Panama
Client: First Quantum Minerals Ltd
Work Scope: Engineering, procurement, and fabrication of the product including pipe, branch pipe, bends, brackets, sleeves, PTFE, CS spool, SS spool, pipe nesting, and de-nesting equipment
Quantity: 20,000 MT
Standard: API 5L, ASTM A139, ASTM A312, ISO 21809-1, ASME B36.19, ASME B31.3, AWS D1.1, AS/NZS 1554.1, AWWA C200
Size: DN1350, DN1800, DN2000, DN2200

Mayfield 7 - Bulk Liquids Berth Project

Designer: Worley
Client: Stolthaven
Location: Newcastle, Australia
Work Scope: Fabrication Management and Project Management for spiral welded pile, longitudinal welded pile shoe, and C9 clutch welding onto piles. Full technical support for fabrication and inspection to fully compliance with Australia Standard.
Quantity: More than 4,300 MT
Standard: API 5L X65 PSL1, AS/NZS 1554.1 Cat SP, AS2980, AS2207, AS117
Single Pile Size: OD 1,422 x WT 25mm x L 43,500mm

Level Crossing Removal Project

Client: Southern Program Alliance (SPA)
Location: Edithvale, Chelsea and Bonbeach, Victoria, Australia
Work Scope: Supply of paired and crimped Z-type sheet pile with sealant application on clutch.
Quantity: 12,000 MT
Standard: EN 10248 S430GP
Single Pile Size: ZZ24-700, ZZ26-700, ZZ28-700, ZZ36-700, ZZ46-700

Amurn Project

Client: RioTinto
Location: Weipa, Australia
EPC Contractor: Bechtel
Work Scope: Fabrication Management and Project Management for Pile pipe with pile shoe and coating.
Quantity: 3,600 MT
Standard: GB/T 1591 Q345B, AS/NZS 1554.1 Cat SP, AS2980, AS2207, AS1171

Webb Dock East 4 Berth Extension Project

Client: Port of Melbourne
Location: Melbourne, Australia
Work Scope: Fabrication Management and Project Management for Pile pipe with pile shoe C9 Clutch, Sheet Pile and coating.
Quantity: 2,700 MT
Standard: GB/T 1591 Q355B, EN 10248 S355GP, AS/NZS 1554.1 Cat SP, AS2207, AS1171, AS1627.4, ISO8501-1, ISO8502-3/6, AS3894.1/3/9/12

Tesoro Avon Wharf Upgrades Project

Client: EMC(Kiewit)
Location: Melbourne, Australia
Work Scope: Fabrication Management and Project Management for Pile pipe with pile shoe and coating.
Quantity: 5,800 MT
Standard: API 5L X52 PSL1/API 2B
Size: OD 457-1,828 x WT 12.7-44.45 x L 12,000-45,000mm

Purple Line Extension Phase 2 Project

Client: Tutor Perini Corporation/O&G JV
Location: Los Angeles, U.S.A
Work Scope: Fabrication Management and Project Management for Deck Beam.
Quantity: 1,900 MT
Standard: ASTM A572 GR.50, AASHTO/AWS D1.5M/D1.5:2015 Fracture Critical Endorsement
Size: W27*146, W36*330, W40*324, W40*397, W40*431, W40*503, W40*593

Hong Kong Zhuhai Macao Bridge Project – CB03 Anti-collision box

Location: China
End User: Hong Kong-Zhuhai-Macao Bridge Authority
Work Scope: Fabrication Management & Project Management for Anti-collision box for bid section CB03
Standard: GB50205 and GB50300
Structure Type: Steel sleeve box
Size: Dimension: 95m*45m*15m
Total weight: 5,998 MT

Shenzhen-Zhongshan Bridge Project – Steel Tunnel

End User: Shenzhen-Zhongshan Channel Management Center
Work Scope: Fabrication Management & Project Management for steel tunnel
Standard: JTS 257 and GB50205
Structure Type: Steel shell
Size: Dimension: 46m~60m*165m*10.6m
Total length: 2,000m
Total weight: 150,000 MT

Shenzhen-Zhongshan Bridge Project – Steel Cylinder

End User: Shenzhen-Zhongshan Channel Management Cente
Work Scope: Fabrication Management & Project Management for Steel Cylinder
Standard: GB/T709 and GB50205
Structure Type: Steel cylinder
Size: Height: 40m; Diameter: 28m
Total weight: 35,000 MT
Maximum span: 28m

Hong Kong Customs Clearance Building

End User: Hong Kong Customs Clearance
Work Scope: Fabrication Management & Project Management for building steel
Standard: EN10219
Steel Grade: S355JR
Quantity: 2,878 MT
Size: Ф(800-350)*25*10,514~14,434

Zhuhai Hengqin Qiqi Bridge Project

End User: Nanning Zongheng Times Construction Investment Co., Ltd.
Work Scope: Fabrication Management & Project Management for Hengqin New District Tianmuhe Road Cross River Bridge, which includes two pedestrian bridges, two pedestrian bridges.
Standard: GB50205 and CJJ 1
Structure Type: Steel box girder
Size: Length: 220m; Width: 30m; Height: 2.5m
Total weight: 1,800 MT
Maximum spam: 66m

Luoxi Bridge Project

End User: Guangzhou Municipal Government
Work Scope: Fabrication Management & Project Management for steel box girder. Key municipal engineering projects in Guangzhou, steel box girder fabrication and on-site tailor welding
Standard: CJJ2-2008
Structure Type: Steel box girder
Size: Total length: 1,912m
Maximum span: 19.3m; Height: 2m
Total weight: 9,354 MT

Luweiqiao Bridge Project

End User: Foshan Nanhai District Government
Work Scope: Fabrication Management & Project Management for choke plate.
Standard: JTG F80/1 and GB 50205
Structure Type: Steel box beam
Size: Total length: 130m
Total weight: 2,000 MT
Maximum span: 65m

Zhaoqing Bridge Project

End Use: Zhaoqing New Area Management Committee
Work Scope: Fabrication Management & Project Management for steel bridge tower
Standard: JTG/T F50 and GB50205
Structure Type: Steel box girder
Size: Length: 164m; Width: 41m; Height: 2.5m
Total weight: 5,600 MT

Shenzhen Exhibition Avenue Bridge 3 Project

End User: Shenzhen Municipal Government
Work Scope: Fabrication Management & Project Management for steel box girder and steel structure processing and production, including middle longitudinal beam, side longitudinal beam, end beam, arch rib, bridge deck, backing plate production.
Standard: GB50205
Structure Type: Steel box girder
Size: Length: 166m
Maximum span: 63m; Height: 3.4m
Total weight: 1,100 MT

Nansha Port Railway Project

End User: Guangzhou Railway Group
Work Scope: Fabrication Management & Project Management for Steel arch bridge processing and installation
Standard: GB50205
Structure Type: Steel sleeve box
Size: Length: 211m; Width: 2.8m; Height: 5m
Total weight: 2,000 MT

Nanning International Exhibition Overpass Bridge Project

End User: Nanning Zongheng Times Construction Investment Co., Ltd.
Work Scope: Fabrication Management & Project Management for steel bridge
Standard: GB50205
Structure Type: Steel box girder
Size: Overall length: 183m; Width: 32m; Height: 2.5m
Total weight: 2,900 MT
Maximum span: 80m